Hi
I work at Brookhaven National Lab in New York
Don't know how many responses you have gotten already but here is my take.

Changing out a fan is a major change in the system dynamics even when replacing in kind. I'm not sure from your question if you have multiple hoods manifolded with the one fan or single fans per hood. 

After checking the fan specs we would conduct a face velocity flow and smoke test at a minimum on all hoods. I assume you have specs for maintaining negative pressure in the room at all variations and check these. 

The ASHRAE 110 test is not ordinarily conducted at BNL but is being instituted for low flow hoods. All new hoods are tested as manufactured and some are tested with this measure as installed. I prefer a modified method that takes into account air currents and movement in the room. 
 
We have an issue with green house gas emissions as a federal facility and this places ASHRAE 110 (SF6) on a high visibility list. We are currently looking for alternatives but don't see one appearing on the horizon for a while yet. We are watching Calif and N2O. 


-----Original Message-----
From: Nowak, Ed 
Sent: Tuesday, December 28, 2010 3:22 PM
To: Peters, John
Subject: FW: [DCHAS-L] Fume hood fan replacement

Would you mind responding if you want

-----Original Message-----
From: DCHAS-L Discussion List [mailto:DCHAS-L**At_Symbol_Here**list.uvm.edu] On Behalf Of Marjorie Markopoulos
Sent: Tuesday, December 28, 2010 1:35 PM
To: DCHAS-L**At_Symbol_Here**LIST.UVM.EDU
Subject: [DCHAS-L] Fume hood fan replacement

Hello--
Does anyone have any thoughts or policies for test requirements for a system of VAV fume hoods after a fan replacement?  Do you have a specific protocol or is full ASHRAE 110 testing required or recommended? As installed? As used?  Any thoughts or comments would be helpful.
Thanks,
Marjorie Markopoulos

Previous post   |  Top of Page   |   Next post



The content of this page reflects the personal opinion(s) of the author(s) only, not the American Chemical Society, ILPI, Safety Emporium, or any other party. Use of any information on this page is at the reader's own risk. Unauthorized reproduction of these materials is prohibited. Send questions/comments about the archive to secretary@dchas.org.
The maintenance and hosting of the DCHAS-L archive is provided through the generous support of Safety Emporium.