Brett,
Good points. But you missed the root causes which would have easily proven the causes, and corrected them prior to any lab occupancy. Any construction project should include an environmental, health and safety review incorporated at multiple steps, from initial design through final acceptance, including having a punch list completed prior to acceptance.
While in the military, we shared best practices with one of the most important being “lessons learned” from faulty engineering or “been-counter” cost reductions. I won several battles citing examples of what was “saved, $” vs. what the actual cost was after the fault was discovered, identified and corrected. Later in civilian life, I found a fume hood actually exhausting all of the contaminants generated back into the lab from a new, prestigious showcase laboratory under construction.
The mechanical engineer, architect and contractor said it was impossible.
We had a high-level meeting to review “my concerns” in the lab. Our company President didn’t care about architects design, mechanical engineering design calculations or industrial hygiene surveys. He wanted something high level that showed the final result.
Thanks Monona! I had a theatrical smoke generator heated up, visibly showed how any vapors generated in the hood would clearly exhaust into the lab, not the exhaust system. The architect said that was impossible. The mechanical engineer tried to figure out how it could happen. My company President simply turned to the architect and said “you fix this, on your dime, to his satisfaction” (pointing to me) and walked out. It was fixed.
BruceV
From: ACS Division of Chemical Health and Safety [mailto:DCHAS-L**At_Symbol_Here**PRINCETON.EDU] On Behalf Of Mayo, Bret
Sent: Thursday, September 6, 2018 6:29 PM
To: DCHAS-L**At_Symbol_Here**PRINCETON.EDU
Subject: Re: [DCHAS-L] One Pass Water Flooding Incidents
I wish I had photos but I don’t. I can share a story, though.
In 2004 we were just moving into the newest research building on campus. My lab was on the second floor and was one of the first ones to get up and running. Labs below us were still waiting on equipment so there wasn’t much in those areas yet. A reaction was set up to run over the weekend. Tubing popped off of a condenser and probably ran for about 14 hours before it was discovered. Some of the lessons learned were:
· We didn’t know that the fume hoods had been installed improperly. The benchtops in that hood and most of the others were not liquid-tight. Also, there was no drip lip milled into the front of the bench surface, so any liquid which made it to the front edge of the bench would not drip down to the floor as it should have, but instead run down the front face of the supporting cabinets and into the chemical storage under each hood.
· Floor drains had been removed from the building plan as a cost saving measure.
· Caulking between floors had been done only where it was easily visible, not under cabinets, so any liquid which found its way into a hidden space would run down into labs below that space.
· The municipal water pressure increased just a little bit after work hours as water usage across the city slowed down for the weekend and that is probably what started the problem.
Tubing attached to a condenser had popped off and fallen into a silicone oil bath. That overflowed and water and silicone oil flowed into chemical storage under the fume hood. Secondary containers in those storage areas filled up and many chemicals began to float as the secondary containers filled. I received a frantic call from a lab worker to told me to bring every wet-dry vacuum and towel that I owned because we had a huge mess. I raced up to the lab with vacuums and towels in tow, plugged in a vacuum, turned it on, and discovered that 1) my better half had recently used it and for some reason had attached the hose to the connection that blew out, not the one that pulled water in, and 2) she had used it to vacuum up a huge amount of sheet rock dust. So now I had a MUCH bigger mess.
Fast forward: We got everything cleaned up. We insisted that floor drains be installed (that is another story for another time). The cost of the water damage in the labs below came to $33,000 which was mostly ceiling tiles, sheet rock, and new paint. If there had been lab equipment in those labs below, the cost would have been much higher. All of the chemicals below the hood which were not harmed by the water exposure had to be carefully wiped down as they all had a light coating of silicone oil and were very slippery. We didn’t do a great job addressing the problem; we purchased a number of water alarms that would dial a phone number if water was detected and we were much more careful about the integrity of tubing and tubing connections. Those labs continue to have periodic water problems from condenser tubing popping off (12 in the last 14 years) but that first one is still the most expensive.
Bret Mayo
North Dakota State University
From: ACS Division of Chemical Health and Safety <DCHAS-L**At_Symbol_Here**PRINCETON.EDU> On Behalf Of Debbie M. Decker
Sent: Thursday, September 6, 2018 2:48 PM
To: DCHAS-L**At_Symbol_Here**PRINCETON.EDU
Subject: [DCHAS-L] One Pass Water Flooding Incidents
Hi All:
I have a couple of hold-outs who insist on using one-pass water in reflux condensers and the like. The “California is in constant drought” argument gets me nowhere.
So I’m looking for flooding incidents when the tubing popped off the condenser and flooded the lab or building, etc. Images would be awesome.
Thanks!
Best,
Debbie
Debbie M. Decker, CCHO, ACS Fellow
Past Chair, Division of Chemical Health and Safety
Councilor and Programming Co-Chair
University of California, Davis
(530)754-7964
(530)304-6728
dmdecker**At_Symbol_Here**ucdavis.edu
Birkett's hypothesis: "Any chemical reaction
that proceeds smoothly under normal conditions,
can proceed violently in the presence of an idiot."
--- For more information about the DCHAS-L e-mail list, contact the Divisional membership chair at membership**At_Symbol_Here**dchas.org Follow us on Twitter **At_Symbol_Here**acsdchas
--- For more information about the DCHAS-L e-mail list, contact the Divisional membership chair at membership**At_Symbol_Here**dchas.org Follow us on Twitter **At_Symbol_Here**acsdchas
Previous post | Top of Page | Next post