From: Bruce Van Scoy <bvanscoy**At_Symbol_Here**TWC.COM>
Subject: Re: [DCHAS-L] Safety Showers, Drains and ADA Compliance
Date: Thu, 1 Feb 2018 18:07:03 -0500
Reply-To: ACS Division of Chemical Health and Safety <DCHAS-L**At_Symbol_Here**PRINCETON.EDU>
Message-ID: 026901d39bb1$610599b0$2310cd10$**At_Symbol_Here**twc.com
In-Reply-To


Melissa,

Push for the drains! Show the cost over time of having testing performed at the recommended frequency without them vs. having them. My experience has shown when the drains were removed due to initial installation costs (proposed as "value engineering"), it wasn't too long after that they were screaming about the frequency of performing flushing/testing. If memory serves, I provided a CDC reference about the eye-damaging bacteria that reproduce in stagnant pipes with the presence of chlorine. The architects and accountants were not available later to justify or defend their "value engineering" decisions, but the initial construction cost did save a few dollars. My recommendation is to push for the drains or define accountability standards to apply later, e.g., is installation cost v. recovery in 1-yr or 5-yr?

BruceV

 

From: ACS Division of Chemical Health and Safety [mailto:DCHAS-L**At_Symbol_Here**PRINCETON.EDU] On Behalf Of Suzanne Howard
Sent: Thursday, February 1, 2018 10:54 AM
To: DCHAS-L**At_Symbol_Here**PRINCETON.EDU
Subject: Re: [DCHAS-L] Safety Showers, Drains and ADA Compliance

 

Hi Melissa,

We are in the process of designing a new science bldg and was told that we can't have drains for the safety showers and the eyewashes.  Our architects state the reason is that the size of the drains would have to be very large.....?  They also indicate that the cost for plumbing is too great.  Have not yet decided if EHS should push for drains or not, or, if it is even possible. 

Suzanne

 

-- 

Suzanne Howard

Director EHS

Wellesley College

300 Central Street

Wellesley, MA

781-283-3882

 

On Thu, Feb 1, 2018 at 10:21 AM, Melissa Anderson <mwanderson08**At_Symbol_Here**gmail.com> wrote:

Greetings Everyone,

 

We're working with architects right now to plan out chem labs for a new science building. We've asked for drains under the safety showers and were told that wouldn't be possible because in order to be ADA compliant and have drains, the safety showers would take up too much space- has anyone encountered such an argument? 

 

(Note, we're extremely constrained on space due to some very complicated politics I won't go into here, so making the labs bigger is not an option.)

 

Thanks,

Melissa Anderson

Instructor

Pasadena City College

--- For more information about the DCHAS-L e-mail list, contact the Divisional secretary at secretary**At_Symbol_Here**dchas.org Follow us on Twitter **At_Symbol_Here**acsdchas



 

 

--- For more information about the DCHAS-L e-mail list, contact the Divisional secretary at secretary**At_Symbol_Here**dchas.org Follow us on Twitter **At_Symbol_Here**acsdchas

Previous post   |  Top of Page   |   Next post



The content of this page reflects the personal opinion(s) of the author(s) only, not the American Chemical Society, ILPI, Safety Emporium, or any other party. Use of any information on this page is at the reader's own risk. Unauthorized reproduction of these materials is prohibited. Send questions/comments about the archive to secretary@dchas.org.