Our university states the the fume hood is an engineering control therefor part of the building maintenance. Mary Ellen On Fri, Jul 9, 2010 at 9:10 AM, Wawzyniecki Jr, Stefan
wrote: > To all who are in Academic Research- > > > > In this tight economy, universities are finding ways to recoup expenses. > > > > How many of you have a Facilities department that supports & services fume > hoods as part of the general infrastructure of the laboratory? Meaning, > they will service water supply, HVAC, sewer, electricity, etc. and consider > fume hoods part of the ventilation system. > > > > Or- > > > > Do any of you have a system in place where Facilities charges individual > departments for their Time & Materials, specifically for fume hoods? > > > > Stefan Wawzyniecki, CIH, CHMM > > University of Connecticut > Our university states the the fume hood is an engineering control therefor part of the building maintenance.
Mary EllenOn Fri, Jul 9, 2010 at 9:10 AM, Wawzyniecki Jr, Stefan <stefan.w**At_Symbol_Here**uconn.edu&g t; wrote:
To=A0 all who are in =A0Academic Research-
=A0
In this tight economy, universities are finding ways to recoup expenses.=A0
=A0
=A0How many of you have a Facilities department that supports & services fume hoods as part of the general infrastructure of the laboratory?=A0 Meaning, they will service water supply, HVAC, sewer, electricity, etc. and consider fume hoods part of the ventilation system. span>
=A0
Or-
=A0
Do any of you have a system in place where Facilities charges individual departments for their Time &=A0 Materials, specifically for fume hoods?
=A0
Stefan Wawzyniecki, CIH, CHMM
University of Connecticut
Previous post | Top of Page | Next post